Smart Upgrade of a Municipal Water Treatment Plant in Shandong
Home / Case Studies / Smart Upgrade of a Municipal Water Treatment Plant in Shandong

Smart Upgrade of a Municipal Water Treatment Plant in Shandong

Shandong Province · Capacity 100,000 m³/d

100,000 m³/d capacity
22%Chemical Cost Reduction
15%Electricity Cost Reduction
14 months payback period

Project Overview

The plant is located in Shandong Province and has a capacity of 100,000 m³/d. Before the upgrade, chemical doses were set by empirical ratios, pump start/stop and speed relied on manual adjustment, and chemicals and electricity were the main operating costs.

Scope of Work

  • Smart dosing control: automatic adjustment of coagulant and disinfectant dosing based on online water quality monitoring data.
  • Pump energy optimization: smart speed control and rotation strategies reduce frequent starts and stops and keep pumps operating in their high-efficiency range.
  • Edge control: BidiTech edge controllers work in a layered arrangement with the existing PLC, retaining the original safety interlocks.

Results

  • Chemical costs reduced by 22%
  • Electricity costs reduced by 15%
  • Automation rate of 95%
  • Payback period of 14 months

Figures compare post-upgrade operation with pre-upgrade operation under the same conditions.