Smart Upgrade of a Municipal Water Treatment Plant in Shandong
Shandong Province · Capacity 100,000 m³/d
Project Overview
The plant is located in Shandong Province and has a capacity of 100,000 m³/d. Before the upgrade, chemical doses were set by empirical ratios, pump start/stop and speed relied on manual adjustment, and chemicals and electricity were the main operating costs.
Scope of Work
- Smart dosing control: automatic adjustment of coagulant and disinfectant dosing based on online water quality monitoring data.
- Pump energy optimization: smart speed control and rotation strategies reduce frequent starts and stops and keep pumps operating in their high-efficiency range.
- Edge control: BidiTech edge controllers work in a layered arrangement with the existing PLC, retaining the original safety interlocks.
Results
- Chemical costs reduced by 22%
- Electricity costs reduced by 15%
- Automation rate of 95%
- Payback period of 14 months
Figures compare post-upgrade operation with pre-upgrade operation under the same conditions.