
Dosing that follows water quality, not empirical ratios
Coagulant dosing in drinking water treatment plants and chemical phosphorus removal and carbon source dosing in wastewater treatment plants are commonly set by flow-proportional ratios or operator experience. When raw water turbidity, influent total phosphorus or nitrate change, dose adjustments often lag behind.
The BidiTech precision dosing system predicts effluent quality from online water quality data and process models, adjusts doses in advance, and constrains the output range and rate of change of dosing pumps.

Control Structure and Technical Parameters
| Item | Description |
|---|---|
| Controlled Variables | Settled water turbidity / effluent total phosphorus / effluent total nitrogen or nitrate |
| Manipulated Variables | Dosing pump frequency or stroke, chemical dosing flow |
| Feedforward and Disturbances | Raw water turbidity, influent flow, influent total phosphorus, water temperature, pH |
| Constraints | Dosing pump operating range, maximum adjustment per unit time, effluent limits |
| Operating Modes | Open-loop advisory / closed-loop control; can revert to the original control mode at any time |

Smart Upgrade of a Municipal Water Treatment Plant in Shandong
Smart dosing control and pump energy optimization: 22% lower chemical costs, 15% lower electricity costs and a 14-month payback period.
Tendering and Implementation FAQ
For a technical proposal for a specific project, please contact the BidiTech technical team.
Do dosing pumps need to be replaced?
Generally not. The system adjusts dosing pumps through the existing PLC or dosing control cabinet, provided the pumps support remote frequency or stroke adjustment.
Can it be implemented without an online total phosphorus analyzer?
Chemical phosphorus removal control requires effluent or process total phosphorus data. Where instruments are missing, the proposal lists the additional instruments required and their installation locations.
What if the tender requires delivery of source code?
Source code and intellectual property terms are negotiated separately. Please discuss your specific requirements with us before bidding.
How is acceptance assessed?
Based on effluent compliance over an agreed period and chemical consumption per unit of water, compared with pre-upgrade data under the same conditions.